  1. Public K-12 Projected Enrollment 2008-13 (5 years) See also:
    California Public K-12 Enrollment and High school Graduate Projection by County - 2008 Series
    (XLS; Outside Source)
    (Department of Finance Demographic Unit)
    Based on Department of Finance October 2008 estimates of graded enrollment
Grade Level
2008-09
2013-14

Five Year Change

Change Per Year
K-6
3,273,426
3,404,427
131,001
26,200
7-8
965,041
933,968
-31,073
-6,215
9-12
1,996,874
1,895,386
-101,488
-20,298
TOTAL
6,235,341
6,233,781
-1,560
-312
  1. Statewide New Construction and Modernization Classroom Need
    Based on eligibility documents on file with the Office of Public School Construction (OPSC) as of June 25, 2008 and projects for which only a design apportionment has been made, the five-year need for new classrooms and the modernization of existing classrooms is:

    New Construction Five-Year Need
    Grade
    Level
    Projected
    unhoused
    students
    Classrooms
    needed
    2008-2013*
    Classrooms
    needed
    per year
    Classrooms
    needed
    per day
    K-6
    295,451
    11,818
    2,364
    6
    7-8
    86,516
    3,204
    641
    2
    9-12
    228,030
    8,446
    1,689
    5
    TOTAL
    609,997
    23,468
    4,694
    13

Modernization Five-Year Need

Grade
Level
Students in
classrooms
over 25
years old
Classrooms
to be
modernized
2008-2013*
Classrooms to be
modernized
per year
Classrooms to
be modernized
per day
K-6
486,336
19,453
3,891
11
7-8
178,431
6,609
1,322
4
9-12
295,863
10,958
2,192
6
TOTAL
800,042
37,020
7,405
21

*Based on 25 students per K-6 classroom and 27 students per 7-12 classroom.

  1. Statewide New Construction and Modernization Funding Need
    The state share of funding, including district financial hardship costs, for approved but unfunded projects and for projects for which eligibility documents have been filed with the Office of Public School Construction as of October 29, 2008 is:
State Share 5 Year Need Per Year
New Construction (50% state share) $ 8.3 billion $1.65 billion
Modernization (60% state share) $ 3.4 billion $0.7 billion
TOTAL (Rounded) $11.7 billion $2.35 billion
  1. State K-12 General Obligation Bond History
Year Dollars
1982 $500 M
1984 $450 M
1986 $800 M
1988 (June) $800 M
1988 (Nov.) $800 M
1990 (June) $800 M
1990 (Nov.) $800 M
1992 (June) $1.9 B
1992 (Nov.) $900 M
1994 (June) $1.0 B (failed by 0.4%)
1996 (March) $2.03 B
1998 (Nov.) $6.7 B (for 4 years)
2002 (Nov.) $11.4 B
2004 (March) $10.0 B
2006 (Nov.) $7.33 B

Million (M); Billion (B)

  1. Public School Data 2007-08. See also: Dataquest and Student Demographics.

    Number of District, 1,050
Number Type of District
556 Elementary Districts
331 Unified Districts
86 High School Districts
77 County Offices, California Youth Authority, and State Special Schools

 

Number of Public Schools 10,127


Number Type of School
5,770 Elementary Schools
1,293 Middle/Jr. High Schools
1,215 High School Schools
1,849 Continuation (Cont.), Alternative (Alt.), etc.

 

Number of Classrooms: 305,754

Number of Classrooms over 25 years old 210,002 (69%)

Number of Charter Schools: 674

Charter School Enrollment: 246,621 (3,94% of K-12 enrollment)

  1. Year-Round Education (YRE) 2006-07. See also Multitrack Year-Round Education
    140 districts use YRE. 64 districts use Multitrack (MTYRE) and 104 use Single Track (STYRE) (some districts use both calendars)
Calendar Elementary MTYRE Elementary STYRE Middle MTYRE Middle STYRE High School MTYRE High School STYRE Cont. High, Alt., etc. MTYRE Cont. High, Alt., etc. STYRE Total MTYRE Total STYRE
Schools 371 533 33 95 25 79 17 55 446 762
Enrollment 301,150 317,839 55,813 72,764 71,543 61,707 13,695 14,834 442,201 467,144

One district use the MTYRE Concept 6 calendar: Los Angeles Unified. Of the MTYRE data cited above, Concept 6 consists of:

  Elementary Middle High Cont. High, Alt., etc. TOTAL
Schools 13 12 15 2 42
Enrollment 10,534 28,772 57,718 6,035 103,059
  1. Basic Construction Data
    These are average costs based on the allowances provided in the State's School Facility Program as presented in the OPSC's September 26, 2007 version of "School Facility Program Statistical and Fiscal Data." Local costs may vary due to district educational program needs and the local building economy.
  Construction Cost per Student* Students per School Construction Cost per School Square Feet per Student School Site Size (Acres)** Cost per Square Foot Land Cost at 25% of Construction Cost Total Cost
Elementary $16,350 600 $9,810,000 71 9.6 $230 $2,452,500 $12,262,500
Middle $18,032 1,000 $18,032,000 85 21.9 $212 $4,508,000 $22,540,000
High $21,624 1,800 $38,923,200 92 44.5 $235 $9,730,800 $48,654,000

*Cost based on twice the state share (as of June 25. 2008) provided in the "School Facility Program." Includes design fees, furniture, equipment, and construction.

**Based on the number of students per school and the guidelines in "School Site Analysis and Development," California Department of Education, 2000 Edition.

Questions:  Shannon Farrell-Hart | sfarrell@cde.ca.gov | 916-323-3923
Download Free Readers